Commercial EV Charging Station Installation in India

End-to-end site design, power load sanctioning, civil execution, DISCOM liaisoning, and commissioning of commercial DC fast chargers for highway plazas, commercial malls, hotels, and fleet hubs in 15–30 days.

Turnaround Time 15–30 Days Civil to Grid Power
Clearances 100% DISCOM CEIG & Tariff Liaisoning
Standard AIS-138 ARAI & Dual CCS2
EPC SCOPE OF WORK

What AmpeIQ Handles 100%

Turnkey EPC
  • ✓
    Dedicated EV Tariff Meter Connection

    Complete paperwork and liaisoning with local DISCOMs (MSEDCL, BESCOM, Tata Power, BSES, UPPCL, TANGEDCO).

  • ✓
    Electrical Infrastructure & LT/HT Panel

    LT/HT panel fabrication, copper busbars, MCBs, ELCBs, and Class II Surge Protection Devices (SPD).

  • ✓
    Twin Chemical Earthing Grid

    Copper-bonded rods with earthing pits maintaining neutral-to-earth potential under 2V for certified hardware protection.

  • ✓
    OCPP 2.0.1 Cloud Activation

    Multi-network 4G router integration connecting chargers to AmpeIQ NOC, automated billing, and live driver discovery apps.

Timeline: 15–30 Days Guaranteed Pan-India Support
ENGINEERING METHODOLOGY

Our 5-Stage Turnkey Installation Process

Precision engineering designed to eliminate grid rejections, reduce cabling costs, and commission faster than industry standards.

01 Days 1–3

Site Audit & Feasibility

Measuring transformer headroom, cable route distance, soil resistivity, and parking bay turning radius.

Deliverable: Electrical SLD & BOM
02 Days 4–12

DISCOM EV Sanctions

Complete liaisoning for special concessional EV tariff, load enhancement, transformer approvals, and drawing sign-offs.

Deliverable: Official Sanction Order
03 Days 13–18

Civil Foundations

Reinforced M25 equipment plinth, underground conduit trenching, safety crash bollards, and weather canopies.

Deliverable: Certified Foundation
04 Days 19–25

Electrical & Earthing

4-core armored cable laying, LT panel with Class II SPD, and twin chemical earthing pits (< 2Ω neutral-to-earth).

Deliverable: Earth Test Report
05 Days 26–30

Testing & Live Activation

Charger hardware bolt-down, CEIG sign-off, OCPP 2.0.1 cloud handshake, and live driver app listing.

Deliverable: Station Live & Earning
🛡️

AmpeIQ On-Time Turnkey Guarantee

We take 100% financial and operational responsibility for DISCOM clearances and CEIG sign-offs.

Request Installation Quote
ENGINEERING BENCHMARKS

Power & Grid Sizing Requirements by Charger Model

Detailed infrastructure guidelines for electrical planning, cable sizing, and transformer sanctioning.

Charger Model Input Voltage Sanctioned Load (kVA) Cable Sizing (Typ. 30m) Earthing Requirements Charge Speed
30 kW DC Fast (CCS2)
Commercial Destinations
415V AC ±10%, 3-Phase, 50Hz 35 kVA 35 sq.mm 4-Core Al Armored 2 Chemical Pits (< 2Ω) 55 – 70 Mins (40 kWh)
60 kW Dual Gun Simultaneous
#1 Bestseller for Hotels & Malls
415V AC ±10%, 3-Phase, 50Hz 70 – 75 kVA 70 sq.mm 4-Core Al Armored 3 Chemical Pits (< 2Ω) 30 – 40 Mins (Dynamic Split)
120 kW Highway Dual Gun
Highways & Expressways
415V AC ±10%, 3-Phase, 50Hz 140 – 150 kVA 150 sq.mm 4-Core Al Armored 3 Chemical Pits + SPD Panel 15 – 25 Mins Rapid
180 kW / 240 kW Hyper Depot
Electric Buses & Logistics Hubs
415V AC (Dedicated 11kV Substation) 200 – 275 kVA 240 sq.mm 4-Core / Bus Duct Ring Earth Grid (< 1Ω) 10 – 18 Mins Rapid
SEAMLESS STATUTORY LIAISONING

Supported State Electricity Boards & DISCOMs

AmpeIQ prepares electrical Single Line Diagrams (SLDs), files applications for special EV concession tariffs, liaises with local DISCOM officials, and manages Chief Electrical Inspectorate (CEIG) approvals across India:

MSEDCL (Maharashtra) BESCOM (Karnataka) Tata Power (Mumbai & Delhi) BSES Rajdhani / Yamuna (Delhi-NCR) UPPCL (Uttar Pradesh) TANGEDCO (Tamil Nadu) TSSPDCL (Telangana) Torrent Power (Gujarat) PGVCL / DGVCL (Gujarat) WBSEDCL (West Bengal)
TURNKEY EPC SITE INQUIRY

Book a Site Feasibility & Grid Audit

Submit your property location and power details below. Our senior infrastructure engineers will review grid availability and provide an EPC proposal within 24 hours.

🔒 100% Confidential • Zero Obligation Site Assessment • 24hr Response Time
COMMON QUESTIONS

EV Charging Installation FAQs

How long does commercial EV charging station installation take in India? ▼
Turnaround time ranges from 15 to 30 business days. Site audit and electrical SLD take 3 days; DISCOM sanctioning takes 7–12 days; civil plinth casting and armored cabling take 5–7 days; charger installation, testing, and CEIG approval take 3–5 days.
What electricity load is required for a commercial DC fast charger? ▼
A 30kW DC fast charger requires approximately 35 kVA sanctioned load. A 60kW dual-gun charger requires 70–75 kVA. A 120kW highway charger requires 140–150 kVA. AmpeIQ assists commercial property hosts with DISCOM load enhancement applications and dedicated EV concession tariffs.
Does AmpeIQ handle DISCOM liaisoning and government clearances? ▼
Yes. As a turnkey EPC contractor, AmpeIQ prepares the electrical single-line diagrams (SLD), files applications for special EV concession tariffs, liaises with local DISCOM officials, and manages Chief Electrical Inspectorate (CEIG) approvals across all Indian states.
What are the civil and safety requirements for installing a DC fast charger? ▼
Installation requires a reinforced concrete plinth, dedicated cable trenching, twin chemical earthing pits maintaining neutral-to-earth voltage under 2V, wheel stoppers, safety crash barriers, all-weather canopy, and Class II Surge Protection Devices (SPD).
What is the difference between COCO and FOCO installation models? ▼
Under the COCO model (Company Owned, Company Operated), AmpeIQ finances 100% of the equipment, civil work, and installation. You provide the parking bays and earn guaranteed rent or tariff profit share. Under the FOCO model (Franchise Owned, Company Operated), you invest in the equipment while AmpeIQ delivers turnkey EPC installation, cloud operations, and driver billing, giving you up to 80% tariff profit margins.