Commercial EV Charging Station Installation in India
End-to-end site design, power load sanctioning, civil execution, DISCOM liaisoning, and commissioning of commercial DC fast chargers for highway plazas, commercial malls, hotels, and fleet hubs in 15–30 days.
What AmpeIQ Handles 100%
-
✓
Dedicated EV Tariff Meter Connection
Complete paperwork and liaisoning with local DISCOMs (MSEDCL, BESCOM, Tata Power, BSES, UPPCL, TANGEDCO).
-
✓
Electrical Infrastructure & LT/HT Panel
LT/HT panel fabrication, copper busbars, MCBs, ELCBs, and Class II Surge Protection Devices (SPD).
-
✓
Twin Chemical Earthing Grid
Copper-bonded rods with earthing pits maintaining neutral-to-earth potential under 2V for certified hardware protection.
-
✓
OCPP 2.0.1 Cloud Activation
Multi-network 4G router integration connecting chargers to AmpeIQ NOC, automated billing, and live driver discovery apps.
Our 5-Stage Turnkey Installation Process
Precision engineering designed to eliminate grid rejections, reduce cabling costs, and commission faster than industry standards.
Site Audit & Feasibility
Measuring transformer headroom, cable route distance, soil resistivity, and parking bay turning radius.
DISCOM EV Sanctions
Complete liaisoning for special concessional EV tariff, load enhancement, transformer approvals, and drawing sign-offs.
Civil Foundations
Reinforced M25 equipment plinth, underground conduit trenching, safety crash bollards, and weather canopies.
Electrical & Earthing
4-core armored cable laying, LT panel with Class II SPD, and twin chemical earthing pits (< 2Ω neutral-to-earth).
Testing & Live Activation
Charger hardware bolt-down, CEIG sign-off, OCPP 2.0.1 cloud handshake, and live driver app listing.
AmpeIQ On-Time Turnkey Guarantee
We take 100% financial and operational responsibility for DISCOM clearances and CEIG sign-offs.
Power & Grid Sizing Requirements by Charger Model
Detailed infrastructure guidelines for electrical planning, cable sizing, and transformer sanctioning.
| Charger Model | Input Voltage | Sanctioned Load (kVA) | Cable Sizing (Typ. 30m) | Earthing Requirements | Charge Speed |
|---|---|---|---|---|---|
|
30 kW DC Fast (CCS2)
Commercial Destinations
|
415V AC ±10%, 3-Phase, 50Hz | 35 kVA | 35 sq.mm 4-Core Al Armored | 2 Chemical Pits (< 2Ω) | 55 – 70 Mins (40 kWh) |
|
60 kW Dual Gun Simultaneous
#1 Bestseller for Hotels & Malls
|
415V AC ±10%, 3-Phase, 50Hz | 70 – 75 kVA | 70 sq.mm 4-Core Al Armored | 3 Chemical Pits (< 2Ω) | 30 – 40 Mins (Dynamic Split) |
|
120 kW Highway Dual Gun
Highways & Expressways
|
415V AC ±10%, 3-Phase, 50Hz | 140 – 150 kVA | 150 sq.mm 4-Core Al Armored | 3 Chemical Pits + SPD Panel | 15 – 25 Mins Rapid |
|
180 kW / 240 kW Hyper Depot
Electric Buses & Logistics Hubs
|
415V AC (Dedicated 11kV Substation) | 200 – 275 kVA | 240 sq.mm 4-Core / Bus Duct | Ring Earth Grid (< 1Ω) | 10 – 18 Mins Rapid |
Supported State Electricity Boards & DISCOMs
AmpeIQ prepares electrical Single Line Diagrams (SLDs), files applications for special EV concession tariffs, liaises with local DISCOM officials, and manages Chief Electrical Inspectorate (CEIG) approvals across India:
Book a Site Feasibility & Grid Audit
Submit your property location and power details below. Our senior infrastructure engineers will review grid availability and provide an EPC proposal within 24 hours.
EV Charging Installation FAQs
How long does commercial EV charging station installation take in India? ▼
What electricity load is required for a commercial DC fast charger? ▼
Does AmpeIQ handle DISCOM liaisoning and government clearances? ▼
What are the civil and safety requirements for installing a DC fast charger? ▼
What is the difference between COCO and FOCO installation models? ▼